PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project

PolyShield New Build Systems

Fast 2K systems for critical building parts.

PolyShield bundles waterproofing, floor protection and quickly applicable coatings for larger new construction packages. Not focused on individual small detail work, but on building components where scale, planning and demonstrable quality make the difference.

Why PolyShield

No general coating party.
A specialist in fast system technology.

The distinguishing value is not in carrying out every little detail, but in combining high-quality 2K polyurea, polyaspartic and project-specific primers into scalable work packages.

  • Move on to the next construction discipline more quickly
  • Repeatable construction over large numbers or surfaces
  • Seamless detailing within the complete building part
  • Control plan and digital delivery file
  • Selected partner companies under one coordinated scope
POSITIONING & SCOPE

Selected building parts.
Completely approached as a system.

PolyShield chooses projects where specialist technology, speed of execution and scale together create sufficient value. This way, the implementation remains technically manageable and commercially appropriate.

PRIMARY SCOPE

Where we actively want to grow.

  • Parking garages and larger parking decks
  • Serial balconies and galleries
  • Podium decks, roof gardens and planter areas
  • Larger basement, lift pit and foundation surfaces
  • Installation roofs and larger new construction roofs
  • Technical and logistics floors
PART OF THE SYSTEM

Details belong to the chosen building part.

  • Connections and uprisings
  • Drains, gutters and local penetrations
  • Construction and movement seams
  • Transitions between materials
  • Local repairs within the work area

These activities are not profiled as a separate small-scale service.

COOPERATION

Specialists where the scope requires.

  • Mechanical surface preparation
  • Heavy or structural concrete repair
  • Striping and additional finishing
  • Access, scaffolding and specialist equipment

Where appropriate, PolyShield organizes a coordinated scope with selected partner companies.

01 / PRIORITY WORK PACKAGES

Big enough to create project value.

Small joints, penetrations and connections are technically included where they are part of the selected building part.

01 / PRIORITY Very high

Parking garages

Waterproof traffic layers, anti-slip ramps and quickly load-bearing parking floors as one larger implementation scope.

TECHNOLOGY DIRECTION
Polyaspartic · 2K synthetic resin
View complete building section page
02 / PRIORITY Very high

Balconies & galleries

Serial waterproofing and wear-resistant finish for larger numbers of balconies and gallery areas.

TECHNOLOGY DIRECTION
2K PU · polyaspartic
View complete building section page
03 / PRIORITY Very high

Stage decks & roof gardens

Seamless waterproofing under an indoor garden, living area, paving or planters.

TECHNOLOGY DIRECTION
2K polyurea
View complete building section page
04 / PRIORITY High

Cellars & lift wells

Protection of larger underground surfaces and pits, with details included within the total system scope.

TECHNOLOGY DIRECTION
Mineral / 2K route
View complete building section page
05 / PRIORITY High

Roofs

Quickly applicable waterproofing for larger roofs, installation roofs and complex new constructions.

TECHNOLOGY DIRECTION
Cold applied 2K polyurea
View complete building section page
06 / PRIORITY High

Technical floors

Early load-bearing floors for technical rooms, storage areas, logistics zones and utilities.

TECHNOLOGY DIRECTION
Fast track polyaspartic
View complete building section page

Planning as a technical criterion

The system choice also follows from the available construction window.

  1. 01Release the surface

    Strength, moisture, contamination and details are checked before application.

  2. 02Quick primer route

    The primer is chosen based on the substrate, moisture condition and desired overcoat period.

  3. 032K application

    A fast-reacting membrane or floor system limits long waiting times between work steps.

  4. 04Controlled delivery

    Consumption, conditions, details and remaining points are recorded per work area.

02 / TECHNICAL SYSTEM MATRIX

From building part to verifiable system route.

The matrix makes visible which technology can be logical, which project information is needed first and when a system may not yet be released.

01 Substrate02 Tax03 Construction window04 Evidence
NB-01 · FloorsMain scope

Parking garages & traffic decks

Larger floor areas, lanes and ramps

TECHNOLOGY DIRECTIONFast-loading 2K polyaspartic with quartz and anti-slip constructionShort overcoating and commissioning times, project-dependent
Surfaces
Concrete · Cement-based screed
Taxes
Wheel traffic · Moisture and de-icing salts · Slip load · Cleaning
View technical selection +

System construction

  1. Mechanical preparation
  2. Project specific primer
  3. 2K base coat
  4. Quartz infusion
  5. Wear-resistant seal layer
  6. Lines

Release points

  • Concrete strength and moisture
  • Cracks and seams
  • Slope and drainage
  • Slip class
  • Available working window

Evidence & registration

  • Adhesion test
  • Consumption registration
  • Slip and chemical performance
  • Delivery per work area

Not releasing when

  • Insufficient carrying capacity
  • Unexplained moisture load
  • Structural cracks without a repair plan

Partner work if necessary

Heavy surface preparation · Structural concrete repair · Line marking if specialist

NB-02 · WaterproofingMain scope

Balconies & galleries

Serial implementation across multiple homes or building blocks

TECHNOLOGY DIRECTIONUV-resistant 2K waterproofing with a hard-wearing, non-slip finishExecution in phases without long waiting times between construction disciplines
Surfaces
Concrete · Cement-bound slope layer
Taxes
Rainwater · UV · Foot traffic · Temperature changes
View technical selection +

System construction

  1. Preparation
  2. Primer
  3. Detail enhancement
  4. 2K membrane
  5. Non-slip finish

Release points

  • Slope
  • Residual moisture
  • Crack image
  • Sills and drains
  • Series details

Evidence & registration

  • Detail drawings
  • Attachment
  • Layer thickness/consumption
  • Outdoor and slip suitability

Not releasing when

  • Insufficient slope
  • Unreleased sill detail
  • Continuous structural crack

Partner work if necessary

Structural repair · Adjustment of sills or metalwork

NB-03 · WaterproofingMain scope

Stage decks, roof gardens & planters

Continuous watertight surfaces under a covered structure

TECHNOLOGY DIRECTIONSeamless 2K polyurea membrane within a root and water resistant systemRapid membrane formation before protection and further deck building
Surfaces
Concrete · Cement-based surface
Taxes
Permanent moisture · Root load · Covered application · Construction site load
View technical selection +

System construction

  1. Preparation
  2. Primer
  3. Reinforced details
  4. 2K membrane
  5. Control
  6. Protective and drainage layer

Release points

  • Slope and compartmentalization
  • Seams and penetrations
  • Drainage plan
  • Protection before covering

Evidence & registration

  • Documented root suitability
  • Detailed registration
  • Layer thickness/consumption
  • Watertightness check

Not releasing when

  • Unclear architectural demarcation
  • No protection plan
  • Inaccessible details

Partner work if necessary

Drainage and green construction · Heavy concrete repair · Paving

NB-04 · UndergroundSelective scope

Basements, lift wells & foundation surfaces

Larger coherent surfaces; details only within the total scope

TECHNOLOGY DIRECTIONMineral, crystalline or zero-VOC 2K route based on water pressure and application sideContinue construction quickly after technical approval of the chosen layer structure
Surfaces
Concrete · Mineral surface
Taxes
Ground moisture · Positive or negative water pressure · Cracks · Limited ventilation
View technical selection +

System construction

  1. Concrete control
  2. Repair and bilge details
  3. Prime if required
  4. Waterproofing layer
  5. Protection

Release points

  • Water side and pressure
  • Tear movement
  • Concrete quality
  • Moisture condition
  • Floor-wall connection

Evidence & registration

  • Pressure water performance
  • VOC documentation
  • Compatibility
  • Detailed and consumption registration

Not releasing when

  • Active constructive movement
  • Unknown water source
  • No working seam design

Partner work if necessary

Injection work · Structural concrete repair · Earthworks and excavation work

NB-05 · WaterproofingMain scope

New construction roofs & installation roofs

Larger roofs and complex installation areas

TECHNOLOGY DIRECTIONCold applied 2K polyurea membrane with project-specific quick primerHigh application speed and short reaction time of the membrane
Surfaces
Concrete · Bituminous base layer · Metal, after release
Taxes
UV · Rain and puddle formation · Temperature · Installation and maintenance traffic
View technical selection +

System construction

  1. Surface control
  2. Primer
  3. Detail enhancement
  4. 2K membrane
  5. Control and delivery

Release points

  • Roof structure and moisture
  • Attachment
  • Slope
  • Installation details
  • Fire performance of the entire structure

Evidence & registration

  • ETA/DoP where applicable
  • BROOF only for tested construction
  • Attachment
  • Consumption and weather conditions

Not releasing when

  • Wet insulation
  • Loose underlay
  • Non-demonstrable fire build-up

Partner work if necessary

Roof safety · Structural repair · Adjustment of installations

NB-06 · FloorsMain scope

Technical & logistics floors

Technical rooms, storage rooms and logistics work areas

TECHNOLOGY DIRECTIONFast-track polyaspartic or water-based 2K epoxy, chosen based on load and indoor climateShort renovation or finishing windows and early load-bearing finishing
Surfaces
Concrete · Cement-based screed
Taxes
Foot and wheel traffic · Cleaning · Local chemicals · Wear and tear
View technical selection +

System construction

  1. Mechanical preparation
  2. Primer
  3. 2K coating or broadcast system
  4. Sealing layer

Release points

  • Flatness and strength
  • Moisture
  • Chemical load
  • Grip
  • Available curing time

Evidence & registration

  • Attachment
  • Slip performance
  • Chemical resistance
  • Curing table and work area registration

Not releasing when

  • Contaminated subsurface without remediation plan
  • Unknown chemical load
  • Substrate strength too low

Partner work if necessary

Heavy preparation · Structural repair · Specialist markings

Technical pre-selection, no product specification.

The final construction will only follow after assessment of drawings, substrate, load, execution time and current technical documentation.

04 / NEW CONSTRUCTION PROJECT SCAN

Click on the building.
Create the initial system scope.

No extensive quote request, but a visual pre-selection. Choose relevant building parts and project phase. The selection will automatically be included in the project interview.

01 · Building parts02 · Project framework03 · Preselection
Realistic section of apartments, podium deck, technical room and parking garage
REALISTIC PROJECT VISUAL / ILLUSTRATIVE PRE-SELECTION / NO TECHNICAL DESIGN

For professional construction teams

Same technique.
Another decision question.

DEVELOPER / INVESTOR

Managing risk and exploitation.

Early insight into critical construction parts, lifespan, maintenance and documentation.

View decision route →
MAIN CONTRACTOR

A clear subcontracting scope.

Demarcation, planning, capacity, inspection moments and transfer visible in advance.

View decision route →
ARCHITECT / CONSULTANT

Specify performance without brand.

Layer structure, subsurface conditions, system boundaries and evidence as design input.

View decision route →
HOUSING CORPORATION

Manageable series quality.

Uniform balconies, galleries and collective spaces with a usable delivery file.

View decision route →
CONSTRUCTION MANAGER / BUYER

Compare complete scopes.

Compare systems on preparation, evidence, planning and risk — not just on m² price.

View decision route →
DRAWINGS OR SPECIFICATIONS AVAILABLE?

Have the larger system opportunities in your project pre-selected.

View specification support & quality assurance →

Upload drawings, describe the project phase and select the relevant construction parts. PolyShield responds with a preliminary scope and the missing technical information.

Start project intake

Knowledge center for new construction

Technically substantiate design choices.

In-depth guides on brand-neutral specification, concealed waterproofing, fast-track flooring and demonstrable quality assurance.

Open the knowledge center
DESIGNSpecify waterproofing earlySPECIFICATIONSBrand-neutral and verifiable questionsDELIVERYFrom ITP to usable file

FROM ORIENTATION TO PROJECT DECISION

Connect to the phase your project is currently in.

You do not have to choose a system or product yet. Start with the information that is already available; we identify what is still technically lacking.
TECHNICAL PRE-SELECTIONNo product advice without substrate and usage data.
CONTROLABLE SCOPEPreparation, system layers, interfaces and release points visible.
COORDINATED COLLABORATIONPartner work is identified and coordinated where the scope requires this.
USABLE TRANSFERProject registration is set up for delivery and future management.