SOL-01 · technical solution route
Stop active leakage
From water route and cause to a controlled injection, joint or surface system route.
Have the project assessed ↗SOL-01 · technical solution route
From water route and cause to a controlled injection, joint or surface system route.
Have the project assessed ↗Why analysis is necessary
Actively intruding water first requires localization. Sealing only the visible leak point can displace water and mask the structural cause.
Intended outcomeA well-defined recovery strategy in which direct leak control and sustainable construction protection are distinguished.
Controlled trajectory
Related expertise
These next steps are linked to application, substrate, risk and decision phase. This way you navigate from general information to technology, evidence and a useful project route.
From target group and four-layer system structure to comparison, boundaries, project evidence and business next step.
View this route →KnowledgeVergelijk reactie, verwerking, planning, systeemopbouw en projectcontrole.
View this route →TechnologyReactive resins for waterways in cracks, joints and hollow structural parts.
View this route →ApplicationControlled sealing of moving, water-laden and industrially stressed joints.
View this route →ApplicationCentrale regionale gids voor complete 2K-daksystemen in Zuid-Holland.
View this route →SolutionVan lekkageroute en bedrijfsrisico naar een technisch begrensde herstelzone.
View this route →