Central knowledge and project pillar
Cold-applied
2K polyurea.
A complete fast-track renovation route for larger commercial roofs — from substrate and primer to details, membrane and documented delivery.
Scroll-controlled system construction
Move through the build-up or select a layer. The visual shows why the white finish is only one part of a complete renovation.
The two-component membrane is applied under controlled mixing, processing and weathering conditions. The result is a seamless, white and UV-resistant waterproofing.
Control: mixing · pot life · layer thickness · coverageView the ten checkpoints ↗
VóórNaEigen projectbewijs
PS / TRANSFORMATION 01 · Vlaardingen · Circa 500 m²Eigen projectbewijs maakt zichtbaar wat een complete renovatieroute op een bestaand bedrijfsdak kan veranderen.
Dynamic Evidence Layer
Select a claim and immediately see what evidence is needed, what remains project-specific and where marketing language should stop.
PolyShield Roof Intelligence
Enter the project address, draw one or more roof areas and add only the information already available. A useful technical pre-assessment is created within minutes.

Confirm moisture condition and adhesion on site first.