PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project

Quality assurance · 9 mins leestijd

Quality assurance and delivery file for waterproofing

A folder with product sheets does not prove that the system has been applied under the right conditions and in the right quantity. Project quality requires traceable implementation data.
01

ITP: who controls what and when?

The Inspection and Test Plan identifies checkpoints, responsibilities, frequency and acceptance criteria. Hold points prevent critical layers from disappearing without release.

  • Substrate clearance
  • Climate and moisture measurements
  • Primer and low consumption
  • Details and connections
  • Final inspection before covering or use
02

Register per logical work area

Link photos, batches, consumption and deviations to recognizable zones. This makes control during implementation and subsequent maintenance much easier.

03

From delivery to management

Add overhaul information, cleaning advice, inspection frequency and repair principles. The file therefore supports the operation instead of just the delivery meeting.

PROJECTCHECK

Five points to determine in advance.

  1. 01Acceptance criteria agreed in advance
  2. 02Work areas recognisably numbered
  3. 03Hold points included in planning
  4. 04Deviations and recovery are traceable
  5. 05Management information included

Frequently asked questions

Short and technical answers.

Which photos are useful?

Overview, surface, details before and after treatment, layer transitions and any deviations, always linked to location and date.

Who keeps the file?

Agree on one digital transfer location and a responsible party, appropriate for the quality or building management system.

VERVOLGSTAP

Apply this knowledge to your project.

TECHNISCH AUTEURSCHAP

PolyShield technisch redactieteam

Samengesteld vanuit uitvoeringspraktijk, systeemdocumentatie en projectmatige kwaliteitscontrole. De inhoud is merkneutraal en bedoeld voor professionele voorselectie.

BRONNENKADER

Bij een projectspecifieke keuze zijn actuele TDS, SDS, DoP, classificaties, ondergrondmetingen en toepasselijke systeemverklaringen altijd leidend. Claims voor een losse component gelden niet automatisch voor de volledige opbouw.