Many installations and interfaces increase the chance that small detail errors will later affect the entire roof function.
NEW BUILD / ROOF SYSTEMS
Seamless 2K waterproofing around complex installations.
New construction and installation roofs increasingly contain penetrations, upstands, cable routes and technical installations. A liquid 2K membrane can follow complex geometry seamlessly, provided that roof structure, moisture, fire performance and details have been released in advance.Activities
New construction roofs and installation roofs as a complete system scope.
New construction and installation roofs increasingly contain penetrations, upstands, cable routes and technical installations. A liquid 2K membrane can follow complex geometry seamlessly, provided that roof structure, moisture, fire performance and details have been released in advance.
- Installation roofs
- Utility roofs
- Roofs with many penetrations
- Concrete roof structures
- White and reflective roof concepts
The technique must be clear before implementation.
- Inaccessible details after installation
- Moisture trapped in the roof structure
- Incorrect connection to non-standard materials
- Non-demonstrable fire performance
- Damage due to follow-up work
PolyShield links a cold-applied 2K membrane to detailed planning, adhesion control, project-specific primer and a demonstrable total roof structure.
Project value
What the complete system delivers.
- 01Seamlessly around complex shapes
- 02No open flame during application
- 03Fast reacting membrane
- 04White UV-resistant version possible
- 05Documentation per roof zone
Four manageable phases.
Test roof structure
Substrate, insulation, vapor barrier, moisture and fastening are considered as a total construction.
Primer and detail route
Materials and connections receive appropriate preparation and controlled detailed construction.
2K membrane
The liquid membrane forms a continuous, UV-resistant waterproofing layer.
Release
Adhesion, consumption, weather conditions and details are recorded before transfer.
Release criteria
When the system can — and cannot yet — start.
Moisture in the build-up
Wet insulation or trapped construction moisture must be examined first; a membrane should not mask this.
Fire performance
BROOF(t1) is only mentioned when the complete selected roof structure has been demonstrably tested for this purpose.
Installation planning
Plinths, penetrations and cable routes must be technically ready and accessible.
Don't just apply.
Also deliver demonstrably.
- ✓ Roof zone and detail plan
- ✓ Adhesion and substrate control
- ✓ Registration of weather and consumption
- ✓ Evidence for the chosen structure
- ✓ Delivery file with detailed photos
Information for every decision maker.
Main contractor
Fewer surprises between roofing and installation technology.
Installation partner
Clear connection conditions around pedestals, penetrations and cable routes.
Real estate investor
A maintainable roof with traceable system information.
Technical questions
Frequently asked questions.
Is every 2K membrane suitable as a final layer?+
No. UV resistance, surface, load and certification differ per technology and construction.
Can solar panels be installed later?+
Yes, when loading, fastening, walkways and protection are included in the design in advance.
Is a white roof automatically energy efficient?+
A light finish can limit surface temperature and heat load, but the actual building effect depends on insulation, climate installation and use.
FROM ORIENTATION TO PROJECT DECISION
Connect to the phase your project is currently in.
You do not have to choose a system or product yet. Start with the information that is already available; we identify what is still technically lacking.Preparing details or specifications
For design teams that want to define performance, building components and system boundaries early.
Start with basic principles →02 / WORK PREPARATIONCheck scope and planning
For construction teams with drawings, quantities or specifications that require technical pre-selection.