NEW BUILD / FAST FLOOR

Loadable early without forgetting use and maintenance.

A fast floor is only valuable if it also matches traffic, chemistry, cleaning, grip and appearance. PolyShield selects fast-track polyaspartic or water-based 2K systems per usage zone and links that choice to the completion schedule.

Activities

Technical and logistics floors as a complete system scope.

A fast floor is only valuable if it also matches traffic, chemistry, cleaning, grip and appearance. PolyShield selects fast-track polyaspartic or water-based 2K systems per usage zone and links that choice to the completion schedule.

  • Technical rooms
  • Logistics work areas
  • Storage rooms and collective spaces
  • Workshops within utility
  • Showroom and service areas
PROBLEM → RISK → SOLUTION

The technique must be clear before implementation.

01 / PROBLEM

A fast standard coating can be walkable early, but still fall short of moisture, tires, chemicals, cleaning or desired grip.

02 / PROJECT RISK
  • Insufficient adhesion to young concrete
  • Heavy loads too early
  • Wrong grip or difficult to clean
  • Chemical attack
  • Damage due to reduction disciplines
03 / POLYSHIELD ROUTE

We combine usage profile, concrete control and available time window in a floor concept with appropriate primer, 2K structure and finish.

Project value

What the complete system delivers.

  1. 01Rapid progress in finishing
  2. 02Finishing per use zone
  3. 03Choice of plain, quartz or flakes
  4. 04Cleanable and wear-resistant route
  5. 05Clear release for commissioning
TECHNICAL ROUTE

Four manageable phases.

01

Usage profile

Traffic, liquids, cleaning, grip and appearance are recorded per room.

02

Concrete preparation

Strength, flatness, moisture and curing residues determine preparation and primer.

03

2K floor construction

Polyaspartic or water-based epoxy is chosen based on speed, indoor climate and load.

04

Finishing and release

Uni, quartz, flakes or anti-slip are checked and released according to the construction window.

Release criteria

When the system can — and cannot yet — start.

Young concrete

Residual moisture and concrete maturation remain leading; a fast product does not replace a surface check.

Chemical load

Cleaning agents, oil or process fluids must be known in advance.

Protection after delivery

Follow-up work must not damage the new floor; temporary protection and routing are agreed.

QUALITY FILE

Don't just apply.
Also deliver demonstrably.

  • Space and load matrix
  • Color and finish choice
  • Work schedule planning
  • Curing and release overview
  • Maintenance and delivery advice
View our documentation method
FOR THE CONSTRUCTION TEAM

Information for every decision maker.

Main contractor

A fast floor route that fits in with the rest of the finishing plan.

User

Grip, cleaning and appearance suitable for daily practice.

Administrator

Clear maintenance information and traceable system selection.

Technical questions

Frequently asked questions.

Can every technical room have the same floor?+

That is rarely optimal. Water, chemistry, traffic and cleaning differ per room and influence the choice of system.

What is the difference between quartz and flakes?+

Quartz is mainly used for grip and mechanical structure. Flakes provide more visual markings and can make minor contamination visually less visible.

How fast is fast track?+

This varies per product, temperature, layer structure and load. The project-specific curing table determines the true release.

FROM ORIENTATION TO PROJECT DECISION

Connect to the phase your project is currently in.

You do not have to choose a system or product yet. Start with the information that is already available; we identify what is still technically lacking.