Business balcony with seamless waterproof floor finish
WD-03 · WATERPROOFING PER BUILDING PART

PolyShield Waterproofing

Make balconies and galleries permanently waterproof

Protect the supporting structure before moisture leads to concrete and consequential damage.

Technical context

First recognize the building part and the load.

Balconies and galleries combine waterproofing, safe use and appearance. The right route connects crack treatment, details, slope, membrane and a wear-resistant non-slip finish.

Problem · cause · solution

From visible defect to substantiated system route.

01 / VISIBLE

Common problems

  • Leakage to underlying spaces
  • Cracks and open connections
  • Loosening tiles or coating
  • Slippery in rain
  • Concrete damage to edges and bottom
02 / INVESTIGATIONS

Possible causes

  • Water penetration through joints and cracks
  • Insufficient slope
  • Movement at facade and sill connections
  • Freeze-thaw load
  • Outdated or missing waterproofing
03 / RESOLVED

Complete system choice

Substrate, primer, details, membrane, protection and evidence are recorded as one project-specific structure.

View suitable systems ↓

Business added value

What the right waterproofing protects or saves.

01

Prevents consequential damage

Early waterproofing limits damage to concrete, reinforcement, facades and underlying spaces.

02

Safe usage layer

Texture and anti-slip are tailored to rain, foot traffic and maintenance.

03

One continuous finish

Complex edges, curbs and drains can be integrated seamlessly.

System selection

Primarily promising, then technically confirmed.

The maps show a system direction. The final variant results from inspection, test adhesion and current technical documentation.

SUITABLE SUBSTRATES
  • Concrete
  • Cement screed
  • Technically suitable existing coating
  • Tile build-up after removal or project assessment
TECHNICAL CHECK FIRST
  • Assess structural cracks separately
  • Slope and drain must function
  • Work out sills and facade details in advance
  • Adjust friction to use and cleaning
NOT AS A STANDARD ROUTE
  • Enclose wet or insufficiently load-bearing surfaces
  • Unknown layers without compatibility check
  • Only cover structural defects with coating
  • Performance claims without appropriate system documentation

From recording to delivery

Four steps that make the system controllable.

  1. 01

    Damage picture

    Cracks, hollow areas, slopes and connections are recorded.

  2. 02

    Concrete repair

    Insufficient load-bearing or corroded zones are repaired first.

  3. 03

    Waterproofing

    Details and membrane are applied as a continuous layer.

  4. 04

    Utility finish

    Wearing layer, color and roughness are tailored to the situation.

Frequently asked questions

For a targeted first project decision.

Is tiling itself waterproof?

No. Grout and tiles do not provide reliable primary waterproofing; below this a matched membrane is needed.

Can a balcony be constructed in parts?

This is sometimes possible, provided that seams, phasing, residents' routes and weather protection are technically worked out in advance.

Visuele waterdichtingsselector

Begin waar uw projectvraag begint.

Kies een bouwdeel, herken een probleem of selecteer het gewenste projectresultaat. U krijgt direct de meest logische technische route.

Waar moet de waterdichting functioneren?

Waterdichting voor platte bedrijfsdakenBOUWDEEL / Bedrijfsdaken
AANBEVOLEN ROUTE

Waterdichting voor platte bedrijfsdaken

Van dakconditie en bedrijfsrisico naar een complete, controleerbare renovatieopbouw.

Bekijk deze route
Dit is een eerste oriëntatie. Definitieve geschiktheid volgt uit ondergrond-, detail- en documentcontrole.

Would you like to have this building part technically assessed?