Risk before price
Hidden waterproofing and heavily loaded floors are assessed for consequential damage, accessibility and repair costs.
POLYSHIELD NEW BUILD / PROJECT DEVELOPERS & REAL ESTATE INVESTORS
Hidden waterproofing and heavily loaded floors are assessed for consequential damage, accessibility and repair costs.
Fast 2K systems can shorten construction time, but only when the substrate, interfaces and work window are cleared in a timely manner.
Maintainability, documentation and uniform system choices count in addition to the direct construction cost.
Similar building parts are bundled so that implementation, control and future management information remain consistent.
Avoid failure costs
Portfolio-like pre-selection on consequential damage, scale and accessibility.
Brand-neutral system requirements, details, supporting documents and demarcation.
Work areas, hold points, registration and transfer per building section.
Traceable system information, detailed photos and maintenance advice.
Relevant work packages
High consequential damage once the waterproofing is covered.
View route →NEW BUILD SYSTEMRepresentation, traffic, water tax and exploitation come together.
View route →NEW BUILD SYSTEMSerial details require demonstrable repeatability.
View route →Ask for a complete layer structure, not just a product name.
Compare surface preparation, details and quality control.
Determine which performance must be demonstrated on a project- or system-related basis.
Make the transfer to management part of the assignment.
Frequently asked questions
Yes. Precisely then, building components, interfaces and evidence requirements can be demarcated in a brand-neutral manner without prematurely committing the implementing party.
Only when the surface, details and logistics are ready. We make visible where the real time savings are and what conditions apply.
Yes. This is often attractive when planning, quality and delivery file need to be coordinated centrally.
Start with drawings, construction parts and planning that are already known. A definitive system does not have to be established yet.
FROM ORIENTATION TO PROJECT DECISION
For design teams that want to define performance, building components and system boundaries early.
Start with basic principles →02 / WORK PREPARATIONFor construction teams with drawings, quantities or specifications that require technical pre-selection.
Share project information →03 / EXECUTIONFor projects with an implementation window, accessible work area and a targeted technical question.
Request project contact →