PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project

POLYSHIELD NEW BUILD / PROJECT DEVELOPERS & REAL ESTATE INVESTORS

Control critical building components before they become operational risks.

PolyShield brings together waterproofing, parking floors, balconies and technical coatings in an early verifiable new construction scope.Have your new construction scope pre-selected
BESLISKADER

Four topics that need to be discussed early.

01

Risk before price

Hidden waterproofing and heavily loaded floors are assessed for consequential damage, accessibility and repair costs.

02

Planning as performance

Fast 2K systems can shorten construction time, but only when the substrate, interfaces and work window are cleared in a timely manner.

03

Operation after delivery

Maintainability, documentation and uniform system choices count in addition to the direct construction cost.

04

Scalable scopes

Similar building parts are bundled so that implementation, control and future management information remain consistent.

Avoid failure costs

Where projects get stuck unnecessarily.

  • System choices that are only made during implementation
  • Waterproofing that disappears without a control or photo file
  • Different solutions per building block without management logic
  • Short-term savings with high repair costs after delivery
INPUT FROM YOUR CONSTRUCTION TEAM

What we need.

  1. 01Building component condition and global surfaces
  2. 02VO/DO drawings and details
  3. 03Intended use and exploitation period
  4. 04Risk and sustainability ambition
  5. 05Planning of critical construction phases
POLYSHIELD OUTPUT

What you get back.

  1. 01Risk-driven building component selection
  2. 02Preliminary system and documentation matrix
  3. 03Cost influencers and scope boundaries
  4. 04Inspection and transfer moments
  5. 05Manageable delivery structure
PROJECTFASEN

The right technical question at the right time.

01Initiative / VO

Which building parts require early technical attention?

Portfolio-like pre-selection on consequential damage, scale and accessibility.

02DO / cutlery

What achievements and boundaries need to be recorded?

Brand-neutral system requirements, details, supporting documents and demarcation.

03Execution

How do quality and planning remain visible?

Work areas, hold points, registration and transfer per building section.

04Handover

What will management need later?

Traceable system information, detailed photos and maintenance advice.

Relevant work packages

Directly to the appropriate building parts.

NEW BUILD SYSTEM

Stage decks & roof gardens

High consequential damage once the waterproofing is covered.

View route →
NEW BUILD SYSTEM

Parking garages

Representation, traffic, water tax and exploitation come together.

View route →
NEW BUILD SYSTEM

Balconies & galleries

Serial details require demonstrable repeatability.

View route →
PURCHASING & EQUIVALENCE

Select by complete value.

  1. 01

    Ask for a complete layer structure, not just a product name.

  2. 02

    Compare surface preparation, details and quality control.

  3. 03

    Determine which performance must be demonstrated on a project- or system-related basis.

  4. 04

    Make the transfer to management part of the assignment.

Frequently asked questions

Clarity before the application.

Can PolyShield be connected already in the design phase?+

Yes. Precisely then, building components, interfaces and evidence requirements can be demarcated in a brand-neutral manner without prematurely committing the implementing party.

Do fast systems always save time?+

Only when the surface, details and logistics are ready. We make visible where the real time savings are and what conditions apply.

Can multiple building parts form one assignment?+

Yes. This is often attractive when planning, quality and delivery file need to be coordinated centrally.

NEXT STEP

Have your new construction scope pre-selected.

Start with drawings, construction parts and planning that are already known. A definitive system does not have to be established yet.

Start business intake

FROM ORIENTATION TO PROJECT DECISION

Connect to the phase your project is currently in.

You do not have to choose a system or product yet. Start with the information that is already available; we identify what is still technically lacking.