Risk before calendar
Prioritize by consequential damage, function, condition and vulnerable details—not just by year of construction or a fixed maintenance cycle.
01 / Decision-maker route
PolyShield helps organize technical risks per object, roof surface or structure. This creates a substantiated route from initial screening to inspection, budget decision, implementation and demonstrable delivery.
Decision framework
Prioritize by consequential damage, function, condition and vulnerable details—not just by year of construction or a fixed maintenance cycle.
First investigate whether the existing structure can be responsibly retained, locally repaired or can function as a support for a new system.
Link technical scope, tenant impact, implementation window and maintenance route to one decision document.
Use the same file structure per object so that choices, checks and residual points across the portfolio remain comparable.
Programmatic approach
The route can be used for one object, multiple workspaces or an entire portfolio. Each subsequent step is only taken when the necessary information is available.
Collect object list, use, known damage, surface area and urgency and organize it into risk classes.
Technically record promising and urgent objects regarding the surface, moisture, details, load and accessibility.
Compare minimum conservation per object, local renovation or integral renovation.
Align work slots and planning with tenants, business operations, safety and weather windows.
Centrally record executed scope, photo evidence, checks, exceptions and maintenance moments.
Decision file
Not every project requires every document in the same depth. The file structure is tailored to complexity, risk, contract form and desired quality assurance.
Governance
Risk management
Decision questions
PolyShield approach
Purchasing & selection
Ask about surface preparation, primer and detail build-up—not just a finished product
Have the total surface and the actual treated scope stated separately
Record checks, exceptions and proof of delivery in advance
Assess execution window and business impact in addition to price
Compare lifecycle strategy and maintainability, not just initial costs
Relevant systems
Evidence & preparation
Frequently asked decision questions
Yes. An initial portfolio pre-selection can rank objects, after which only urgent or promising locations receive a more extensive inspection.
Not automatically. For complex objects, technical verification takes place first; This prevents a price from being based on assumptions.
Yes. Phasing is tailored to risk, accessibility, users, weather conditions and available renovation windows.
In addition to roof and construction waterproofing, floors, concrete, metal, joints and civil details can also be included. The technology follows the object risk.
NEXT STEP
A complete technical solution does not have to be known yet. Object address, usage function, known damage, photos, global size and desired planning are sufficient for an initial business pre-selection.