Floors & planning · 7 mins leestijd

Fast-track floor systems in new construction planning

A fast resin is not a fast project route if the surface has not yet been released or other disciplines are blocking the work space. Therefore, plan based on the entire process.
01

Calculate the work space, not one drying time

Include preparation, dust control, primer, intercoats, finishing, curing and transfer. This creates a realistic renovation or completion window.

  • Available temperature and ventilation
  • Residual moisture and age of the substrate
  • Accessibility and internal logistics
  • Moment of mechanical and chemical loading
02

Polyaspartic as a quick finishing route

Polyaspartic systems can be quickly overlaid and loaded and offer choices in uni-color, flakes or broadcast. The exact structure follows from use and desired texture.

03

Work with zones and phases

Divide larger floors into logically transferable work areas. Determine walking routes, temporary separation and connecting seams so that other disciplines can continue predictably.

PROJECTCHECK

Five points to determine in advance.

  1. 01Working window determined per zone
  2. 02Subsurface measurements scheduled
  3. 03Finish and slip level selected
  4. 04Logistics arranged during curing
  5. 05Actual release criteria agreed

Frequently asked questions

Short and technical answers.

Can a fast-track floor be loaded on the same day?

This is possible under certain structures and circumstances, but should never be promised generically. The project-specific documentation and temperature are leading.

What finishes are possible?

Including uni-colour, flakes, colored quartz and anti-slip, depending on load and cleaning.

VERVOLGSTAP

Apply this knowledge to your project.

TECHNISCH AUTEURSCHAP

PolyShield technisch redactieteam

Samengesteld vanuit uitvoeringspraktijk, systeemdocumentatie en projectmatige kwaliteitscontrole. De inhoud is merkneutraal en bedoeld voor professionele voorselectie.