Calculate the work space, not one drying time
Include preparation, dust control, primer, intercoats, finishing, curing and transfer. This creates a realistic renovation or completion window.
- Available temperature and ventilation
- Residual moisture and age of the substrate
- Accessibility and internal logistics
- Moment of mechanical and chemical loading
Polyaspartic as a quick finishing route
Polyaspartic systems can be quickly overlaid and loaded and offer choices in uni-color, flakes or broadcast. The exact structure follows from use and desired texture.
Work with zones and phases
Divide larger floors into logically transferable work areas. Determine walking routes, temporary separation and connecting seams so that other disciplines can continue predictably.