PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Outdated existing bitumen commercial roof prior to renovation

BITUMEN ROOF RENOVATION · VLAARDINGEN

Renovate a bitumen commercial roof in Vlaardingen without unnecessary demolition

Do not replace automatically and do not coat automatically: first demonstrate which parts can be kept dry, stable and durable.

EXISTING BITUMEN · FIRST DETERMINE CONDITION
BEHOUDwhere responsible
BITUMENconditiegestuurd
SCENARIOrepair or renovation

FOR WHOM THIS ROUTE IS FOR

Business project selection before product selection.

  • Commercial property owners
  • Property and maintenance management
  • Industry and logistics
  • HOA and portfolio management

PROBLEM AND CAUSE

An old bitumen roof can look worn, while the renovation opportunities differ per zone.

Crackle, blisters, folds and repairs say something about the condition, but not necessarily about moisture in the structure or the remaining adhesion.

01

UV and age

The top layer loses flexibility and shows cracking.

02

Trapped moisture

A wet build-up cannot be responsibly overcoated.

03

Detail tax

Edges and penetrations often age differently than the main surface.

THE SOLUTION ROUTE

Three scenarios objectively side by side: local repair, integral coating or replacement.

Inspection and moisture information determine feasibility. The chosen renovation limit is then developed as a complete system scope.

  1. 01
    Condition survey

    Damage, moisture and adhesion are assessed.

  2. 02
    Recovery decision

    Weak areas are repaired or excluded.

  3. 03
    Primer and details

    Compatibility and connections are substantiated experimentally.

  4. 04
    Waterproof 2K membrane

    Only suitable zones will receive a complete renovation structure.

BUSINESS ADDED VALUE

What the complete approach actually delivers.

No unnecessary demolition

Usable roof parts can be retained.

Less waste

Conservation can limit material flows.

Clear investment

Scenarios are linked to a usage horizon.

Controllable scope

You know which areas have and have not been treated.

REGIONAL PROJECT CONTEXT

Vlaardingen commercial roofs require a sensible choice between preservation and replacement.

In industrial, logistics and commercial real estate, accessibility, continuity and future building plans count. A renovation must be technically and economically compatible with the remaining useful life.

01Vlaardingen02Schiedam03Maassluis04Rotterdam West05Midden-Delfland06Corner of Holland

OWN PROJECT PROOF

Planned retention of approximately 700 m² of outdated bitumen

Our own project shows the route from existing roof and preparation to primer, reinforced details and white 2K finish.

View all system steps
Outdated existing bitumen commercial roof prior to renovation
Verouderd donker bitumen bedrijfsdak in Vlaardingen vóór renovatieVóórNa

Eigen projectbewijs

PS / TRANSFORMATION 01 · Vlaardingen · Circa 500 m²

Van verouderd bitumen naar een licht bedrijfsdak in Vlaardingen.

Een uitgevoerd project van circa 500 m² verbindt de regionale zoekvraag direct aan aantoonbare uitvoering.

Ondergrond
Verouderd bitumen
Resultaat
Een doorlopend licht dakoppervlak dat minder zonnewarmte absorbeert dan het oorspronkelijke donkere bitumen.

FROM INITIAL SCOPE TO DELIVERY

A short route for the customer, complete control behind the scenes.

  1. 01Determine building purpose and usage horizon
  2. 02Examine roof condition and moisture
  3. 03Compare scenarios and renovation limits
  4. 04Carry out substrate, details and membrane
  5. 05Delivery with maintenance advice

SMART PREPARATION

First compare the possible system direction

The configurator combines bitumen, condition, project goal and planning into a first transparent route.

Open the System Configurator

FREQUENTLY ASKED QUESTIONS

Clear answers without absolute product claims.

Can a roof be coated with crackle?+

Sometimes, but only after assessing stability, moisture and adhesion. Crackle alone is not a sufficient selection criterion.

What happens to wet insulation?+

Wet or uncertain zones are not automatically enclosed and require repair or additional research.

Is renovation always cheaper than replacement?+

No. The condition, details, scope of restoration and usage horizon determine the economic outcome.

Can a test surface be made?+

Yes. An adhesion or system test can be part of the technical preparation.

PROJECT IN VLAARDINGEN

First have it tested which system route is technically and business-friendly.

Share location, surface, photos, surface and desired planning. This is followed by a targeted assessment without a generic square meter promise.

SUBMIT PROJECT Discuss via WhatsApp →