PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Large existing bitumen roof after white renovation without complete demolition

RENOVATE BUSINESS ROOF · WITHOUT AUTOMATIC DEMOLITION

Renovating a commercial roof between Rotterdam and The Hague

Compare renovation and replacement objectively in terms of moisture, residual quality, business impact and remaining usage horizon.

KEEP EXISTING ROOF · AFTER TECHNICAL INSPECTION
BEHOUDwhere responsible
SCENARIOrenovation vs. replacement
RAPPORTsubstantiated scope

FOR WHOM THIS ROUTE IS FOR

Business project selection before product selection.

  • Commercial roof owners
  • Asset and real estate management
  • Education and social real estate
  • HOA and complex management

PROBLEM AND CAUSE

Complete replacement may be too heavy; keep repairing just too light.

Many roofs are somewhere between emergency repair and total replacement. Then a substantiated renovation scenario is needed that fairly takes into account residual quality, wet zones and usage horizon.

01

Fragmented maintenance

Loose repairs do not build cohesive waterproofing.

02

Uncertain residual quality

It is not always visible from the outside what insulation and underlays do.

03

Wrong horizon

A solution must fit the remaining function of the building.

THE SOLUTION ROUTE

A scenario selection before the quotation.

We compare retention, local replacement and complete replacement. Preservative 2K renovation is only given priority if there is a stable and sufficiently dry base.

  1. 01
    History and usage horizon

    Collect faults, repairs and building plans.

  2. 02
    Roof survey

    Assess moisture, adhesion, build-up and slope.

  3. 03
    Scenario and boundaries

    Retain, replace and make exclusions visible.

  4. 04
    Carry out renovation

    Repair, primer, details and membrane delivered in a controlled manner.

BUSINESS ADDED VALUE

What the complete approach actually delivers.

Investment fit

The intervention is in line with the remaining building function.

Less nuisance

Preservation can reduce demolition and logistical impact.

Decision making

Scenarios can be explained to management, board or owner.

Future management

Excluded zones and maintenance points remain visible.

REGIONAL PROJECT CONTEXT

The urban corridor requires technical and logistical customization.

From Rotterdam via Delft and Rijswijk to The Hague, there are many large roofs above offices, education, retail and business processes. A renovation plan must therefore also include accessibility, users and phasing.

01Rotterdam02Schiedam03Delft04Rijswijk05THE HAGUE06Zoetermeer

OWN PROJECT PROOF

Lifespan extension tailored to building planning

With a school roof of approximately 700 m², complete replacement was not self-evident. The chosen renovation was in line with the remaining usage horizon.

View the consideration and system structure
Large existing bitumen roof after white renovation without complete demolition

FROM INITIAL SCOPE TO DELIVERY

A short route for the customer, complete control behind the scenes.

  1. 01Determine building purpose and urgency
  2. 02Objectively investigate roof condition
  3. 03Compare retention and replacement
  4. 04Offer an administratively explainable scope
  5. 05Execute and document in phases

SMART PREPARATION

Does renovation make business sense?

The value check combines roof condition, usage horizon, consequential damage and project size in an initial decision route.

Do the Renovation Value Check

FREQUENTLY ASKED QUESTIONS

Clear answers without absolute product claims.

When can existing bitumen be retained?+

When the build-up is stable, sufficiently dry, repairable and suitable for the chosen primer and membrane.

Is coating always cheaper than replacing?+

No. Extensive repairs, wet insulation, poor adhesion or an unsuitable structure can make replacement more effective.

Can the choice be recorded in a report?+

Yes. Findings, project boundaries, system direction and caveats can be summarized in a project-specific report.

Does this also work for multiple buildings?+

Yes. The Portfolio Scan first helps prioritize which roofs most need inspection or intervention.

PROJECT IN ROTTERDAM–DEN HAAG

First have it tested which system route is technically and business-friendly.

Share location, surface, photos, surface and desired planning. This is followed by a targeted assessment without a generic square meter promise.

SUBMIT PROJECT Discuss via WhatsApp →