Design the hidden layer as a critical building part
Determine compartmentalization, drains, upstands, penetrations and transition to facades. Also determine which protective and drainage layers will follow and who will prevent damage during subsequent work.
Release before covering
Plan a formal hold point where outstanding details, layer structure and registrations are checked.
- Visual detail check
- Consumption and batch registration
- Photos per work area
- Appropriate leak or integrity control
- Agreement on protective layer and work route
File for future management
Keep revision drawings, worksheet photos and product documentation in a findable place. This allows the manager to act in a more targeted manner during subsequent adjustments.