PolyShield Concealed Deck

Covered waterproofing under tiles and terrace structures

An elastic 2K waterproofing system that is inspected and documented before it is covered.

What this system was developed for

A clear project role, not a universal coating.

APPLICATION

Balconies and terraces

Under tiling

Stage decks

Wet outdoor areas

SUBSTRATE

Concrete

Cement screed

Suitable repair mortar

PROJECT VALUE

Waterproofing designed separately from visible finish

Fast membrane route possible

Details visible before covering

Suitable for renovation and new construction

DIRECT TECHNISCH ANTWOORD / PS-PUA-05

When is this route promising?

When waterproofing under tiles or a terrace finish, tiles and joints do not form the primary water barrier. The 2K membrane, slope, details, adhesive layer and movement joints must be designed as one compatible structure

PS-PUA-05 / interactive system build-up

See what every system layer does.

Separate the layers, select a function and see which control point and project evidence belong to the next work phase. This visual is a technical selection framework, not a universal installation detail.

Illustrative system build-up.The final primer, layer thickness, reinforcement, finish and application follow from substrate assessment and current technical documentation.

Complete system construction

Each layer has one controllable function.

The structure shown is a selection frame. Primer, layer thickness, consumption and details are only finalized after inspection, test surface and document check.

LOW 01

Slope-bearing base

Organize flatness, strength and drainage

LOW 02

Primer and details

Control pores, ridges and penetrations

LOW 03

2K waterproofing

Elastic seamless membrane layer

LOW 04

Adhesive layer

Compatible bridge to finish

LOW 05

Tile or terrace finishing

Include use, aesthetics and load

Technical gate

Check first.

01Slope and drainage

02Cracks and dilations

03Residual moisture

04Tile adhesive and finishing

05Load and thermal movement

System Passport

This must remain demonstrable after implementation.

01

Subsurface measurements

02

Detail drawings

03

Compatibility Statements

04

Photo file before covering

Project evidence under construction

This system family is only linked to a reference when the scope and implementation are demonstrable.

Until then, we will not show a generic or borrowed project claim. Share your project situation for a project-specific assessment.

Have a project assessed

Frequently asked technical questions

Short answer, clear line of evidence.

Aren't tiles and grout already waterproof?+

No. They form a utility finish; the reliable primary waterproofing is in the designed membrane layer below.

Can the finish be placed immediately after application?+

Only after the prescribed curing, checking and release of the selected structure.

Are dilations simply overcoated?+

No. Structural joints must be able to continue to absorb their movement in the complete structure.

Technical floor

Lees verder op de vragen die voor deze opbouw beslissend zijn.

Details

When detail reinforcement is needed

Geotextiles strengthen selected transitions, but do not replace a structural joint or damage assessment.

Lees technisch antwoord ↗
Attachment

Why a primer is not an afterthought

The primer function depends on the substrate, porosity, moisture and the chosen membrane technology.

Lees technisch antwoord ↗
File

Documentation of a professional system

TDS, SDS, DoP, ETA and reports must be linked to the actually applied project structure.

Lees technisch antwoord ↗