Documents before the quotation

Collect TDS, SDS, DoP, CE information, any ETA, classification reports and a current substrate and primer table.

Check date, language, product variant and intended use before values are adopted.

  • TDS and SDS
  • DoP and CE
  • ETA and EAD
  • BROOF report if relevant
  • Primer and compatibility table

Documents during execution

Work plan, weather conditions, mixing, consumption, batch data and detailed photos connect product evidence to the actual project.

Deviations and recovery points must remain visible instead of disappearing after delivery.

Delivery and maintenance

A delivery file specifies system structure, checks carried out and maintenance limits. Warranty text is linked to conditions and not formulated as general lifetime promises.

For real estate portfolios, the same structure allows comparison between properties.

Important

This explanation is general and does not constitute project-specific system advice. Subsurface investigation, tax and official system documentation remain decisive.