PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Groot Nederlands bedrijfsdak met een gefaseerde witte renovatiezone

Clear commercial focus

Ontwikkeld voor beslissers die risico, levensduur en bedrijfscontinuïteit samen moeten afwegen.

250+ m²

Appropriate business entry

Commercial roofs and shared roof areas where a professional site survey and complete system build-up make economic sense.

500–5.000 m²

Ideal project core

Logistics, production, education, offices and commercial real estate with plannable work zones.

Portfolio

Multiple objects

Real estate managers, corporations and owners who want to prioritize roofs instead of reacting separately to leaks.

Construction partner

Specialist scope

Contractors and roofers who want to outsource primer, detail and membrane work in a controlled manner.

Scroll-controlled system construction

Not a single coating layer.
Four controlled functions.

Move through the build-up or select a layer. The visual shows why the white finish is only one part of a complete renovation.

DIGITAL SYSTEM CROSS SECTION / NOT TO SCALE
04 / SYSTEM FUNCTION

White UV-resistant 2K membrane

The visible waterproof final layer.

The two-component membrane is applied under controlled mixing, processing and weathering conditions. The result is a seamless, white and UV-resistant waterproofing.

Control: mixing · pot life · layer thickness · coverageView the ten checkpoints
Verouderd donker bitumen bedrijfsdak in Vlaardingen vóór renovatieVóórNa

Eigen projectbewijs

PS / TRANSFORMATION 01 · Vlaardingen · Circa 500 m²

Van donker bitumen naar een licht 2K-daksysteem.

Eigen projectbewijs maakt zichtbaar wat een complete renovatieroute op een bestaand bedrijfsdak kan veranderen.

Ondergrond
Verouderd bitumen
Resultaat
Een doorlopend licht dakoppervlak dat minder zonnewarmte absorbeert dan het oorspronkelijke donkere bitumen.

Dynamic Evidence Layer

Any technical claim
is given an evidentiary limit.

Select a claim and immediately see what evidence is needed, what remains project-specific and where marketing language should stop.

CLAIM / Documentable

UV-resistant finish layer

Evidence required
Project-specific TDS and system variant
Fair border
Only claim for the membrane variant actually used.
Open Technical Evidence Center

PolyShield Roof Intelligence

From address to a professional initial roof report.

Enter the project address, draw one or more roof areas and add only the information already available. A useful technical pre-assessment is created within minutes.

Usually 3–5 minutesNon-binding digital pre-assessment
  1. 01
    Enter address± 30 seconds
  2. 02
    Draw the roof± 2 minutes
  3. 03
    Describe the situation± 1–2 minutes
Multiple addresses? Start Portfolio Scan
± 3,420 m²Indicative roof area
EXAMPLE RESULTBAdditional investigation required

Confirm moisture condition and adhesion on site first.

  • Indicative roof area
  • A, B or C pre-classification
  • Risk and inspection points
  • Potential system direction
  • Photo and detail file
  • Professional PDF summary
Digital pre-assessment — not a substitute for inspection, project specification or structural advice.

First technical preselection

Een goede specialist durft ook ‘eerst onderzoeken’ te zeggen.

Choose the situation closest to your roof. This is not project advice, but makes visible which next step is professional.

A
TECHNICAL PRE-SELECTION

High potential for a complete renovation assessment

The roof structure appears coherent and repairable. The next step is substrate, moisture and adhesion control; only then are primer, details and membrane recorded.

Open de passende vervolgstap →

Fast without compromising control

Short renovation windows start with preparation and logistics.

01

No open fire

Koude applicatie beperkt brandrisico’s van open-vlamwerk, maar vraagt nog steeds een locatie- en veiligheidsplan.

02

Fast system components

Fast-drying primers and an early load-bearing 2K route can limit waiting time when the surface and conditions are suitable.

03

Work areas and phasing

Large roofs are organized around access, installations, users and business processes.

04

Airless where responsible

Spray application can be investigated for large surfaces, provided that wind, air inlets, environment and spray mist are controllable.

Objective system selection platform

Not every white roof is technically the same.

We do not compare brand names, but system structure, substrate, details, maintenance and application limits. This way the choice remains controllable.

SELECTED ROUTE

Cold applied 2K polyurea

Chances of when
Larger business renovations with a complete primer, detail and membrane build-up.
Technical point of interest
Accurate mixing, processing time and substrate condition require professional control.
Future maintenance
Maintenance and future connection must be assessed within the chosen system family.
Final performance and compatibility follow exclusively from the documentation of the exact system variant and the project situation.

Commercial project routes

Identify your building, problem or decision.

Iedere pagina is geschreven voor een eigen zoekintentie en leidt terug naar dezelfde technische kern. Zo ontstaat inhoudelijke autoriteit zonder generieke kopieën.

PR-01

Renovating a bitumen commercial roof with cold-applied 2K polyurea

Open projectroute ↗
PR-02

Coating a large commercial roof as a complete 2K renovation project

Open projectroute ↗
PR-03

Roof renovation without full replacement: compare the technical scenarios first

Open projectroute ↗
PR-04

Renovating a school roof with a cold-applied 2K system

Open projectroute ↗
PR-05

2K polyurea roof renovation for production and logistics

Open projectroute ↗
PR-06

Integrating complex roof details into one waterproof 2K system

Open projectroute ↗
Detailversterking tijdens een uitgevoerd schooldakprojectOWN EXECUTION IMAGE / DETAIL ENHANCEMENT

Evidence before promises

What must remain verifiable after completion.

  • Project address, roof zones and indicative surface area
  • Existing surface and observed condition
  • Chosen preparation, primer and detail route
  • Applied system structure and relevant consumption
  • Uitvoerings- en detailfoto’s
  • Inspection points, deviations and outstanding items
  • Maintenance and reinspection advice

Technical questions before quotation

Clear answers without sales talk.

Can cold applied 2K polyurea be applied over bitumen?+

This is only possible if the existing roof structure is stable, sufficiently dry, repairable and compatible. Seams, bubbles, insulation, previous repairs and adhesion should be assessed first.

What is the difference with hot-spray polyurea?+

Cold applied systems are processed without a heated high-pressure spray installation and have a different reaction time and application method. Hot spray can respond extremely quickly, but requires specialized equipment and a different project organization.

Why is 2K different from 1K?+

Bij 2K worden twee componenten gecontroleerd gemengd. Dat maakt snelle reactie en specifieke eigenschappen mogelijk, maar stelt hogere eisen aan menging, verwerkingstijd en werkvakplanning. 1K- en 2K-prestaties mogen niet op één hoop worden gegooid.

Is a white coating automatically a Cool Roof?+

No. Color alone does not prove reflection performance, emission, layer thickness, durability or building savings. Product documentation, contamination, maintenance, insulation and building use play a role.

Hoe lang duurt 1.000 m²?+

It is not responsible to promise generically. Cleaning, repair, details, primer, weather window, accessibility and application method determine the turnaround time. After recording, a work area and planning scenario can be drawn up.

When is complete replacement better?+

In the case of wet insulation, loose layers, serious structural defects or an insufficiently repairable structure, partial or complete replacement may be technically more correct.

Large roof or real estate portfolio?

Start with a technically useful first data set.

Deel adres, dakoppervlak, type dakbedekking, foto’s, bekende problemen, gebruik onder het dak en gewenste planning. U hoeft nog geen systeem te kiezen.

Choose the right business route Meet één dak onlineHave multiple objects prioritizedDiscuss the project via WhatsApp