PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Large metal roof of an industrial company hall

METAL BUSINESS ROOF ROTTERDAM · CORROSION & WATERPROOFING

Restore and protect a metal commercial roof in Rotterdam

Not just refinishing, but technically assessing corrosion, fastenings, seams, gutters and existing coating together.

METAL · CORROSION · LARGE SURFACES
METAALroof and facade
AIRLESSafter environmental check
B2Bindustry and logistics

FOR WHOM THIS ROUTE IS FOR

Business project selection before product selection.

  • Industry and production
  • Logistics real estate
  • Industrial halls
  • Asset and facility management

PROBLEM AND CAUSE

Metal roofs often fail at the transition between protection and waterproofing.

Corrosion, loose fastenings, open overlaps and outdated coatings each require their own preparation. A new coat of paint alone does not repair those underlying causes.

01

Corrosion

Damaged protection causes steel to deteriorate further.

02

Movement

Overlapping and fastenings respond to temperature.

03

Water routes

Gutters and screw zones concentrate loads.

THE SOLUTION ROUTE

Pretreatment, detail repair and coating as one work plan.

The condition of steel and existing coating determines cleaning, rust removal and priming. Specialist heavy pre-treatment can be organized within the same project management.

  1. 01
    Inspection and bonding

    Corrosion class and existing layers are assessed.

  2. 02
    Pretreatment

    Cleaning and mechanical preparation follow from the condition.

  3. 03
    Restore details

    Overlaps, fastenings and gutters are treated in a targeted manner.

  4. 04
    Apply protective layer

    Application follows from layer type, range and environment.

BUSINESS ADDED VALUE

What the complete approach actually delivers.

Lifespan

Targeted corrosion control protects the metal.

Waterproofing

Seams and fastenings are not forgotten.

Economies of scale

Airless can limit lead time on open surfaces.

One direction

Preparation and application remain connected.

REGIONAL PROJECT CONTEXT

Rotterdam industry requires environmental and safety discipline.

Around the Spaans Polder, Schiedam and Rijnmond, wind, air intakes, traffic and business processes play an important role in the method and work zone.

01Rotterdam02Schiedam03Vlaardingen04Capelle aan den IJssel05Barendrecht06Ridderkerk

OWN PROJECT PROOF

System route for large metal surfaces

The approach combines corrosion protection with watertight details and scalable application.

View the technical metal route
Large metal roof of an industrial company hall

FROM INITIAL SCOPE TO DELIVERY

A short route for the customer, complete control behind the scenes.

  1. 01Metal condition and coating history
  2. 02Determine adhesion and pre-treatment
  3. 03Design details and shielding
  4. 04Apply primer and protective layers
  5. 05Checking and maintenance advice

SMART PREPARATION

Can this surface be safely sprayed airless?

Check wind, fog risk, air intakes, obstacles, height and logistics before choosing the application method.

Start the Spray Scan

FREQUENTLY ASKED QUESTIONS

Clear answers without absolute product claims.

Can you coat a rusty roof directly?+

No. Loose corrosion and insufficiently adhesive layers must first be suitably prepared.

Is airless always sprayed?+

No. Environment, spray mist and detail density determine whether rolling, spraying or a combination is suitable.

Do you do blasting yourself?+

Heavy specialist pre-treatment can be organized within the project management with suitable partners.

Can gutters and mountings be included?+

Yes, it is precisely these parts that should be assessed in the technical scope.

PROJECT IN ROTTERDAM

First have it tested which system route is technically and business-friendly.

Share location, surface, photos, surface and desired planning. This is followed by a targeted assessment without a generic square meter promise.

SUBMIT PROJECT Discuss via WhatsApp →