PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Large light commercial roof with skylights after renovation

COOL ROOF · AMSTERDAM-WESTPOORT

Cool Roof for large commercial roofs in Amsterdam-Westpoort

Designing a white roof as a technical system: waterproof, maintainable and linked to building use.

LARGE LIGHT COMMERCIAL ROOF · COMPLETE WATERPROOFING
WITlower sun absorption
2Kwaterproof membrane
GROOTlogistics real estate

FOR WHOM THIS ROUTE IS FOR

Business project selection before product selection.

  • Logistics property owners
  • Warehouses and distribution
  • Industrial real estate
  • ESG and facility management

PROBLEM AND CAUSE

A white color layer does not make a reliable Cool Roof.

Reflection is relevant, but moisture, insulation, cooling, pollution and roof details determine whether the investment adds technical value.

01

Dark surface

High sun absorption heats the roof.

02

Incomplete construction

Without primer and details, a final coat can fail.

03

Pollution

Maintenance affects the light surface.

THE SOLUTION ROUTE

Waterproofing, sun exposure and maintenance in one route.

First, roof condition and building purpose are determined. This is followed by a complete light 2K build-up with realistic expectations.

  1. 01
    Building purpose

    Name waterproofing and comfort separately.

  2. 02
    Roof suitability

    Test moisture and residual quality.

  3. 03
    Complete 2K build

    Combine primer, details and white membrane.

  4. 04
    Maintenance route

    Record inspection and cleaning.

BUSINESS ADDED VALUE

What the complete approach actually delivers.

Less absorption

A light surface can heat up less.

Roof preservation

Suitable bitumen is retained.

Waterproofing

No cosmetic paint layer.

Fair business case

No absolute savings claim.

REGIONAL PROJECT CONTEXT

Westpoort combines large roofs with industrial preconditions.

Logistics routes, installations and air intakes require a work plan. Airless is only interesting if wind, mist and environment are controllable.

01West Gate02Port-City03Sloterdijk04Amsterdam North05Zaandam06Diemen

OWN PROJECT PROOF

White 2K renovation on large roofs

Own files show how main surfaces and details are constructed as one watertight system.

View relevant roof projects
Large light commercial roof with skylights after renovation

FROM INITIAL SCOPE TO DELIVERY

A short route for the customer, complete control behind the scenes.

  1. 01Collect building purpose and roof data
  2. 02Assess roof condition
  3. 03Compare white systems
  4. 04Determine work areas
  5. 05Record maintenance

SMART PREPARATION

Start the Cool Roof preselection

Combine aerial photo, surface, roof condition and building purpose.

Launch Roof Intelligence

FREQUENTLY ASKED QUESTIONS

Clear answers without absolute product claims.

Does a white roof always save energy?+

No. Insulation, cooling and use determine the effect.

Is polyurea always better than silicone?+

No. Surface and project goal determine the system choice.

Can a large roof be built in phases?+

Yes, provided phase transitions are technically designed.

Is airless possible?+

Only after testing wind, air intakes and fog risk.

PROJECT IN AMSTERDAM-WESTPOORT

First have it tested which system route is technically and business-friendly.

Share location, surface, photos, surface and desired planning. This is followed by a targeted assessment without a generic square meter promise.

SUBMIT PROJECT Discuss via WhatsApp →