PolyShield Systems · Netherlands & Belgium
POLYSHIELDSYSTEMSRequest project
Menu
What would you like to solve?
Waterproofing systems
Spray application
Solutions
Products
Floor systems
Projects Knowledge base Services Request project
Large seamless floor in a commercial space

BUSINESS FLOOR LOGISTICS · SCHIPHOL

Fast-hardening industrial floor for logistics around Schiphol

Adjust floor renovation to driving routes, load and operational clearance, not just to drying time.

LOGISTICS FLOOR · SHORT WORK WINDOWS
SNELplanned release
LOGISTIEKzones and routes
2Kwear-resistant systems

FOR WHOM THIS ROUTE IS FOR

Business project selection before product selection.

  • Warehouses and distribution
  • Cargo and service companies
  • Workshops
  • Facility management

PROBLEM AND CAUSE

Downtime is a technical and operational risk.

Forklift trucks, point loads and pollution require more than a new color. A quick coat without preparation shifts the problem.

01

Tax

Wheels and pivot points show wear.

02

Pollution

Oil affects adhesion.

03

Time window

Zones must be put back into operation quickly.

THE SOLUTION ROUTE

A zone system for load, grip and release.

Traffic routes, surface, cleaning and downtime are linked to construction and work areas.

  1. 01
    Tax card

    Distinguish routes and charging points.

  2. 02
    Preparation

    Remove weak top layers.

  3. 03
    Fast 2K build

    Match primer and wear layer.

  4. 04
    Grip and marking

    Organize safe use.

BUSINESS ADDED VALUE

What the complete approach actually delivers.

Less downtime

Phased implementation.

Targeted grip

Texture by function.

Maintainable

Closed surface.

Clear release

Time of use explicit.

REGIONAL PROJECT CONTEXT

Schiphol requires floors that are planned around operations.

Warehouses and service zones have different taxes. Access, shifts and traffic flows determine the work areas.

01Schiphol02Schiphol-Rijk03Hoofddorp04Nieuw-Vennep05Aalsmeer06Badhoevedorp

OWN PROJECT PROOF

Fast seamless floor with controllable details

Own images show polyaspartic floor finish and edge details.

View the floor project
Large seamless floor in a commercial space

FROM INITIAL SCOPE TO DELIVERY

A short route for the customer, complete control behind the scenes.

  1. 01Withdraw taxes
  2. 02Investigate the surface
  3. 03Choose work areas
  4. 04Perform per zone
  5. 05Check hardening

SMART PREPARATION

Link load and downtime to a floor route

Compactly record use, grip and renovation time.

Start the floor selection

FREQUENTLY ASKED QUESTIONS

Clear answers without absolute product claims.

Can a warehouse remain open?+

Often partial, with safe zones and routes.

Is polyaspartic always best?+

No. Surface and load determine the choice.

Can anti-slip be added?+

Yes, after determining grip and cleaning.

Is one night always enough?+

No. Preparation and release also take time.

PROJECT IN SCHIPHOL-HOOFDDORP

First have it tested which system route is technically and business-friendly.

Share location, surface, photos, surface and desired planning. This is followed by a targeted assessment without a generic square meter promise.

SUBMIT PROJECT Discuss via WhatsApp →