What you can observe
In design or work preparation, several responsible parties are involved in concrete, joints, drainage, coating and finishing.

Problem guide · New build
Basement, deck, ramp and joints must function as one water-controlled structure.
Problem · cause · effect
In design or work preparation, several responsible parties are involved in concrete, joints, drainage, coating and finishing.
If interfaces are distributed late, leakage paths, repair costs and discussions about responsibility may only become visible after commissioning.
Record water load, concrete concept, joints, penetrations, deck and floor finishing and inspection moments early in one coordinated system and demarcation scope.
Possible causes
These causes constitute a targeted checklist, not a remote diagnosis.
Project-specific control
The Problem Guide provides direction, but does not make an unfounded material claim. For a final system choice, we check the situation on location or based on sufficient project information.
Value of a complete approach
In-depth and evidence
Frequently asked questions
Preferably in design or early work preparation, before joints, slopes, penetrations and finishes are final.
Not always. PolyShield can coordinate appropriate specialist scopes and partner companies within one project framework.
Drawings, water load, concrete concept, joint plan, planning, use and desired delivery documentation.
Short route to implementation
The project fit prevents an unnecessarily long application. Your problem situation is selected in advance and known data then travels automatically.