Preparation
Cleaning, degreasing, corrosion or concrete repair and drying time remain part of the total lead time.
Large Surface Coating
From approximately 1,000 m², airless can be a strong business route for large roofs, halls, metal facades and concrete. Not because spraying is automatically faster, but because the main surface, logistics and quality control are designed as one process.
WHERE TIME IS SAVING
The advantage lies mainly in a continuous material supply and an even application on extensive main surfaces. Details, connections, repairs and critical edges remain separate craftsmanship.
That is why we separate preparation, detail phase, main application and control. In this way, tempo can be planned without making layer thickness, adhesion or environmental control secondary.
SIX TIME SETTINGS
Cleaning, degreasing, corrosion or concrete repair and drying time remain part of the total lead time.
An open main surface provides more economies of scale than a surface with many details, installations and varying profiles.
Wind, traffic, PV panels, air intakes and production determine shielding and available work areas.
Primer, intermediate coat, main coat and top coat each have a processing window and control point.
Material supply, aerial work platforms, hose routes and safe access must be continuously available.
Phasing can keep the business open, but affects relocation, masking and net application time.
METHOD COMPARISON
The optimal method may differ per profession. The comparison is recorded project-specifically.
Strong on large, accessible and controllable main surfaces.
Logical for small zones, sensitive environments or limited shielding.
Spraying to scale; rolling and manual work on details and vulnerable edges.
PROJECTVOLGORDE
NO GENERIC PRODUCTION CLAIM
PolyShield does not publish a universal number of m² per day. After inspection, the client receives a phasing in which accessibility, preparation, product windows, weather reserve, partner work and quality checks are clearly included. This makes planning manageable for real estate management, production and implementation.
VóórNaEigen projectbewijs
PS / TRANSFORMATION 03 · Uithoorn · Circa 2.000 m²De vergelijking maakt de schaal zichtbaar en koppelt het eindbeeld aan een gecontroleerde voorbereiding en uitvoering.
BUSINESS QUESTIONS
No. It is a commercial target size. A smaller profiled surface can be interesting, while a large but extremely detailed or fog-sensitive project is better carried out in a hybrid manner.
A reliable number only follows after inspection. Product, layer thickness, surface, details, drying time, shielding, weather and logistics determine the daily production. PolyShield records the assumptions in the work plan.
No. Labor can be reduced at the main level, but additional shielding or complex preparation can reduce the benefit. We compare the entire implementation route.
Work areas and coordinated ventilation can often be phased. Critical production, traffic routes and air intakes are included in the implementation plan in advance.
First project fit